These are pictures of the inside. The first 2 are of the bathrooms. They have hung towel racks, tp holders, mirrors, lights and put in the shower door (picture 2) in our bathroom and done the same in the kids bathroom (picture 1). We absolutely hate the lights above the mirror, but we are just going to live with them for the time being. We have plenty of time to change them out, a little at a time. They have begun to lay the hardwood floors in the dining room (picture 3), living room and hallway. The counter tops and kitchen cabinets are in (picture 4/5). We are hoping to be in by Thanksgiving or the day after!!! They don't have much more to do, however we have already noticed some things that need fixed before we sign the contract. All of the items we want fixed will be addressed at our final walk through with the contractor. We hope that will be later this week! Keep your fingers crossed for us, we have to be out of the house we are renting on the 30. So, things need to move quickly
Sunday, November 16, 2008
Finishing up!
These are pictures of the inside. The first 2 are of the bathrooms. They have hung towel racks, tp holders, mirrors, lights and put in the shower door (picture 2) in our bathroom and done the same in the kids bathroom (picture 1). We absolutely hate the lights above the mirror, but we are just going to live with them for the time being. We have plenty of time to change them out, a little at a time. They have begun to lay the hardwood floors in the dining room (picture 3), living room and hallway. The counter tops and kitchen cabinets are in (picture 4/5). We are hoping to be in by Thanksgiving or the day after!!! They don't have much more to do, however we have already noticed some things that need fixed before we sign the contract. All of the items we want fixed will be addressed at our final walk through with the contractor. We hope that will be later this week! Keep your fingers crossed for us, we have to be out of the house we are renting on the 30. So, things need to move quickly
Monday, November 3, 2008
The Inside



It has been a while since there were visible changes in the building process. Now, all drywall is done, they spackled and sanded. The upstairs is taped and ready to be painted. Eric went there today and said that there were cabinets in the kitchen and master bath. Things are coming along. We are to be in within the next 4 weeks. There is still a lot to be done. We will see!!!!
Subscribe to:
Comments (Atom)